Project Overview
Awarded by the City of Charlotte on August 11, 2025, this project enhances stormwater management, reduces roadway and property flooding, and improves the long-term condition of public infrastructure. Existing steel storm drainage pipe is removed and replaced with precast concrete box culverts and reinforced concrete pipe, new water and sanitary sewer mains are installed, and foundation protection safeguards nearby homes during construction. Impacted streets are restored with full-depth asphalt reconstruction, milling and resurfacing.
Type of Work
Steel Storm Pipe Removal, Precast Concrete Box Culverts, Reinforced Concrete Pipe, Trench Rock Excavation, Water and Sanitary Sewer Mains, Foundation Protection, Full-Depth Asphalt Reconstruction, Milling and Resurfacing