Scaleybark Station Drainage Repairs

Crew working on drainage beside the tracks as a CATS light rail train passes

Project Overview

Installation of a new culvert crossing beneath the Charlotte light rail alignment between New Bern Station and Poindexter Road. Awarded on December 8, 2025 with a contract value of $713,487, the drainage and infrastructure work required careful coordination within an active transit corridor, including light rail corridor closures, road closures and traffic detours. The project was completed safely while minimizing impacts to surrounding transportation infrastructure and improving long-term stormwater conveyance and drainage performance for the area.

Type of Work

Erosion and Sediment Control, Road Closures and Traffic Detours, Light Rail Corridor Closures and Coordination, Cast-in-Place Concrete Trench Drains, Storm Drainage Pipe, Asphalt Pavement Reconstruction, Site Grading and Drainage Improvements